The
Shack, continued
The
week we did most of the building of the Shack was extremely hot and it
seemed to rain almost every day. We camped out nearby, near the lumber,
which had to be carried to the site.
 |
|
This
is the east side wall of the shack going up. The posts are 12 feet
high to give room for a sleeping loft. |
| |
|
|
 |
|
The
walls are up, the floor joists are in and we are getting ready to
lay the subflooring (sheets of plywood). George is taking a brief
rest. |
| |
|
|
 |
|
The
flooring is down and we are getting ready to put in the corner braces
and rafters. We didnt put any more framing for walls than this before
putting up the wall sheathing. The wall framing for windows and insulation
went up in 1991 after we moved. |
Go
to the next page of Shack pictures.